What are the ACI building code requirements for placing concrete in a tropical climate? • The effects are larger for the concrete mix with slump = 30 mm and smaller for the concrete mix with slump = 180 mm • The compaction effort has significant effects on the 7-day and 28-day cube strengths • The effects are larger for the concrete mix with slump = 30 mm and smaller for the concrete mix with slump = 180 mm 9 BAHADUR SHAH ZAFAR MARG NEW DELIiI 110002 Price Rs. The air temperature is not greater than 50 o F for more than one-half of any 24 hour period. Maximum Hardened Concrete Temperature . There are two types of deflections. What are the temperature limits for mass concrete? time, about 1 or more hours, can result in concrete strength loss, temperature rise, excessive loss of entrained air, and accelerated slump loss. - For steel-concrete composite structures EN 1994-1-2 will recommend the upper limit. 1. This article highlights concrete temperature limits at different conditions based on different standards such as ACI Code, ASTM standards, and Australian Standard (AS). The composition of the Committee responsible for formulation ofthis standard is given in Annex C. 1 ⁄ 2 The ACI Code provides the accepted empirical expression for modulus of elasticity:. American Concrete Institute. Section R7.12.3 of the commentary states that these prestressed reinforcement requirements … is, limit state design and working stress design may be used; and d} Provision for crack width calculations due to temperature and moisture and crack width in mature concrete have been incorporated as Annex A and Annex B, respectively. Immediate Elastic Deflection: This occurs due to elastic behaviour of structure under load. Founded in 1904 and headquartered in Farmington Hills, Michigan, USA, the American Concrete Institute is a leading authority and resource worldwide for the development, dissemination, and adoption of its consensus-based standards, technical resources, educational programs, and proven expertise for individuals and organizations involved in concrete design, construction, and materials, who share a commitment to pursuing the best use of concrete. Phone: 1.248.848.3800, Home > Tools > Frequently Asked Questions, Q. This limit is for general types of hot weather construction such as pavements, bridges, and buildings, not mass concrete. New developments reckognized as much as possible 4. d) Basis of supply modified to bring it in line with IS 456:2000 ‘Plain and reinforced concrete — Code of practice’. “Effect of Temperature and Delivery Time on Concrete Proportions,” R.D. Workability 7. 4. Khan, Temperature Effects on Concrete, ASTM STP 858, June 1985; also NRMCA Pub. When truck mixers are used, ASTM C 94 (AASHTO M 157) also limits the time between batching and complete discharge of the concrete at the job site; this time is 1 . The reason for this change was to be in line with Part 1 of Eurocode 2, where material properties are valid up to 100°C. average maximum temperature limit of concrete at core is 60°C. Type of cement to be used 3. The simple truth of the matter is that concrete placed and cured at a moderate temperature (60° to 80° F) will outperform +90° F concrete in strength and durability. A. ACI 301-20 “Specifications for Concrete Construction” and ACI 305.1-14 “Specification for Hot Weather Concreting” limit the maximum concrete temperature to 95 °F (35 ºC) at the time of discharge. In today’s market, it is imperative to be knowledgeable and have an edge over the competition. Maximum water-cement ratio 6. Phone: 1.248.848.3800 1. Standard Form 298 (Rev. Nonetheless, ASTM C 1064-86 set a maximum limit between 26.7°C and 35°C. Read More: Step – 3 Estimation of Air Content: The approximate volume of entrapped air content to be expected in normal (non-air-entrained) concrete is … Maximum nominal size of aggregates; Minimum & maximum cement content; Maximum water-cement ratio; Workability; Exposure conditions (As per IS-456-Table-4) Maximum temperature of concrete at the time of placing; Method of transporting & placing; Early age strength requirement (if any) Type of aggregate (angular, sub angular, rounded etc) 1.5. Maximum temperature in concrete after placement shall not exceed 160°F (70°C). Anchor bolts are located a minimum of 1 3 / 4 inches (45 mm) from the edge of the concrete parallel to the length of the wood sill plate. 1.4. C or be less than 2. o. Maximum nominal size of aggregates 4. It is concluded from the chart that the retardation effect is more pronounced when a higher concrete temperature … References: ACI 301-20; ACI 207.1R-05; ACI 207.2R-07; ACI 207.4R-05 The revised concrete code titled “Code of Practice for Structural Use of Concrete 2013” was formally promulgated by the Buildings Department of Hong Kong in end February 2013 which supersedes the former concrete code 2004. Temperature profiles in Annex A of EN 1992-1-2 are based on the lower limit. k1 (crack width limit for tightness class 1 structures) • X min depth of section to remain in compression for tightness class 2 structures • κmaximum duct size related to wall thikness • t 1 and t 2 minimum wall thicknesses for class 0 and class 1 or 2 structures respectively. These codes state that, concrete should be discharge within time limit ranges from 1 hour to 1.5 hours after water is added to the mixture. The maximum anchor nominal diameter is 5 / 8 inch (16 mm). Anchor bolts are embedded into concrete a minimum of 7 inches (178 mm). References: ACI 301-20; ACI 305.1-14; ACI 305R-20; ACI 207.1R-05; ACI 207.2R-07; ACI 224R-01; ASTM C1064, Topics in Concrete: cracking; hot weather; durability; placing; shrinkage, Search other resources on the ACI website for answers to technical questions. ACI World Headquarters significant degradation of concrete is around 65-93°C (150-200°F). When truck mixers are used, ASTM C 94 (AASHTO M 157) also limits the time between batching and complete discharge of the concrete at the job site; this time is 1. The temperature of the concrete as placed should be above 40 degrees Fahrenheit using methods described above, however the duration of heating is dependent on the type of service for the concrete, ranging from one day for high-early strength concrete that is not exposed to freeze-thaw events during service to 20 days or more for a concrete element that would carry large loads at an early age. Some concrete specifications contain a maximum temperature for the freshly mixed concrete as delivered. Section 7.12.3 of ACI 318-02 requires prestressing tendons to be proportioned to provide a minimum average compressive stress of 100 psi (0.7 MPa) on gross concrete area. For temperature, volume changes, and cracking problems associated with mass concrete refer to section 8 of ACI 301-20, ACI 207.1R-05 “Guide to Mass Concrete”, 207.2R-07 “Report on Thermal and Volume Change Effects on Cracking of Mass Concrete”, and 224R-01 “Control of Cracking of Concrete Structures”. Title of Legally Binding Document: Temperature Control of Mass Concrete for Dams - Guideline Number of Amendments: Equivalence: Superceding: Superceded by: LEGALLY BINDING DOCUMENT Step Out From the Old to the New--Jawaharlal Nehru Invent a new India using knowledge.--Satyanarayan Gangaram Pitroda Addeddate 2013-09-13 07:13:13 Identifier gov.in.is.14591.1999 … Computer modeling to predict fresh concrete temperature could be used to assist in determining control measures but shall not be used as a substitute for preconstruction testing. Please enter search criteria and search again, Americans with Disabilities Act (ADA) Info, ACI Foundation Scholarships & Fellowships, ACI Collection of Concrete Codes, Specifications, and Practices - On-line. References: ACI 301-20; ACI 305.1-14; ACI 305R-20; ACI 207.1R-05; ACI 207.2R-07; ACI 224R-01; ASTM C1064 Second Floor, Office #207 IS 3558:1983 Code of practice for use of immersion vibrators . Farmington Hills, MI The code requirements for prestressing tendons used for shrinkage and temperature reinforcement might provide a starting place. Building Code Requirements for Structural Concrete (ACI 318-11) and Commentary First Printing August 2011 ISBN 978-0-87031-744-6 American Concrete Institute® Open minded: models with different degree of complexity allowed 5. 0.7 This standard is intended chiefly to cover the technical provisions relating to bending and fixing of bars for concrete reinforcement, and it PLAIN AND REINFORCED CONCRETE ­ CODE OF PRACTICE ( Fourth Revision) Tenth Reprint APRIL 2007 (IncludingAmendments No. Dubai, UAE If you are looking for superior concrete, control the temperature. Maximum temperature limits for hot-weather concreting. Q. As simple as possible, but not simplier 6. As per IS 456 – 2000, concrete should not be cured less than 7 days for ordinary Portland Cement, & it must be at least 10 days for concrete with mineral admixtures or blended cement. Section 7.12.3 of ACI 318-02 requires prestressing tendons to be proportioned to provide a minimum average compressive stress of 100 psi (0.7 MPa) on gross concrete … How to Calculate the Initial Concrete Temperature . The maximum temperature at which concrete can be placed & cured depends on the design mix of the concrete. Some concrete specifications contain a maximum temperature for the freshly mixed concrete as delivered. In case of hot weather and arid temperature conditions, the curing should not be less than 10 Days for OPC and 14 days for concrete with blended cement & mineral admixtures. The maximum temperature in the enclosure shall not exceed 700C at any point in time, reducing the risk of potential deleterious Delayed Ettringite Formation (DEF) within the concrete member. Application of some code equations to some available experimental data. 0.6 Wherever a reference to any Indian Standard appears in this code, it shall be taken as a reference to its latest version. Q. The MRTS70 Specification gives a required maximum concrete temperature at the end of the steam curing cycle of 750C. SOIL AND FOUNDATION ENGINEERING INDIAN STANDARD CODE BOOKS FREE DOWNLOAD PDF IS 1080 1985 Code of Practice For Design And Construction Of Shallow Foundations In Soils (Other Than Raft, Ring And Shell) CLICK HERE IS 1498 1970 Classification and identification of soils for general engineering purposes CLICK HERE IS 1888 1982 Method of […] Maximum Reinforcement Ratio: Reinforcement ratio is the ratio of reinforcement area to gross concrete area based on total depth of slab. IS 3466:1988 Specification for masonry cement. AS 1379[7]recommended that, mixing water shall be drawn from a source of acceptable quality. and type of cement, the temperature within concrete members with dimen-sions of 12 to 36 in. 37 degree, in hot weather its recommended to use ice in … 1.2. Concrete Temperature Limits. The Offices 2 Building, One Central Concrete Temperature Calculator; Strength Converter; Gradation Analyzer; Maximum Joint Spacing Calculator; Rate of Delivery Calculator; Westergaard; Apple iOS Apps. minimising the risk of a cold joint being formed. For more information and details on hot weather concrete, refer to ACI 305.1-14 and ACI 305R-20 “Guide to Hot Weather Concreting”. Invalid Email Address. Maximum temperature in concrete after placement shall not exceed 160°F (70°C). IS 456: 2000 CONTENTS PAGE SECTION 1 GENERAL J SCOPE 2 REFERBNCES 3 TERMINOLOGY 4 SVMBOU … 2. Temperature Monitoring of Concrete. In UAE the maximum allowable concrete temperature is 30C. The design method specified in this code of practice for the design of precast concrete elements is the Limit State Design method. Typical values are between 80° and 95° F as measured by ASTM C 1064-86. What are the ACI building code requirements for placing concrete in a tropical climate? I and 2) ICS 91.100.30 C BI52000 BUREAU OF INDIAN STANDARDS MANAK BHAVAN. Fresh concrete was covered with planks as a protection from the sun, and the concrete was kept wet until hardening occurred. The definition of when to apply cold weather concrete provisions, per ACI 306, differs based on the ACI edition referenced by the applicable building code. What is the minimum and maximum temperature of fresh concreting? Shrinkage and temperature reinforcement requirements for design of reinforced concrete structures have been included in the ACI building code since 1928, and haven’t changed much in nearly 85 years. temperature, therefore, certain test setups, such as dissolved oxygen, sulfides, residual chlorine, nitrite and pH should be fixed atsite. If the concrete delivery rate is greater than 60 cubic yards/ hour (more than one concrete pump) then the contractor might need to place cooling elements with water pipes to stay below the maximum temperature of 160° F. This would cost $70 to $100/cy. 1.2.2 1900 to 1930—After the turn of the century, construction of all types of concrete … A. Scientifically well founded, consistent and coherent 2. ... As per BS 1881-208:1996 [Testing concrete. 120.09. In the past, obtaining the actual in-place strength was a challenge, but with recent developments in technology, using concrete maturity testing to determine the in-place strength as become a lot easier. These codes state that, concrete should be discharge within time limit ranges from 1 hour to 1.5 hours after water is added to the mixture. Farmington Hills, MI g) Sampling procedure has been modified. Experts agree that the best temperature to pour concrete is between 50-60 °F.The necessary chemical reactions that set and strengthen concrete slow significantly below 50 °F and are almost non-existent below 40 °F.Even when daytime temperatures are within the satisfactory range, winter concrete setting creates risks that could result in weak, inadequate concrete. The chapter discusses the simplified procedure adopted in IS 456:2000 code (Clause-23.2). Computer modeling to predict fresh concrete temperature could be used to assist in determining control measures but shall not be used as a substitute for preconstruction testing. time, about 1 or more hours, can result in concrete strength loss, temperature rise, excessive loss of entrained air, and accelerated slump loss. Dubai, UAE Deflection limits depend on the codes being used for design of structures. ACI members have it…they are engaged, informed, and stay up to date by taking advantage of benefits that ACI membership provides them. In harmony with other codes. To asses the accuracy of code equations and the most common formulas for predicting crack width in reinforced concrete members, a comparison is carried out with the experimental results reported by Makhlouf and Malhas .The comparison includes two factors affecting the crack width such as the steel stress and concrete … The code requirements for prestressing tendons used for shrinkage and temperature reinforcement might provide a starting place. According to ACI 301 “Specifications for Structural Concrete”, the following temperature limits shall apply for mass concrete placements: Maximum temperature in concrete after placement shall not exceed 160°F (70°C). e) Transportation time made uniform to 2 h. t) Requirement of temperature of concrete deleted. Over the years, I have seen very little to support the validity of having a maximum temperature requirement in hot weather, provided the mix has been properly designed. 37 degree celsius is maximum temperature is allowed for concrete during pouring on site. Phone: 1.248.848.3800, Home > Tools > Frequently Asked Questions, Q. Reasons to Set Concrete Temperature Limit. This is the step where we gather all the required information for designing a concrete mix from the client. Founded in 1904 and headquartered in Farmington Hills, Michigan, USA, the American Concrete Institute is a leading authority and resource worldwide for the development, dissemination, and adoption of its consensus-based standards, technical resources, educational programs, and proven expertise for individuals and organizations involved in concrete design, construction, and materials, who share a commitment to pursuing the best use of concrete. Based on UK experience (BS 8110-2: 1985), by limiting temperature differential to 20°C in gravel aggregate concrete, cracking can b e (30 to 91 cm) can increase approximately 36°F to 108°F (20°C to 60°C) during the first 2 days after casting. The maximum temperature limit of 160°F (70°C) exists to prevent delayed ettringite attack (DEF), while the maximum temperature difference limit of 35°F (19°C) exists to prevent thermal cracking. All codes of practice have established time limits for concrete discharge for example ACI 301 and ASTM C94. Please enter this 5 digit unlock code on the web page. Where required, the specification of a maximum time between placing layers of concrete should take account of the likely temperature of the concrete, cement type, mix proportions, the use of admixtures with set retarding properties and consistence of the concrete. Recommendations for the determination of the initial surface absorption of concrete] (ISAT). The public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, ... (Include area code) (303) 445-2374. These costs would decrease as the allowable maximum temperature is increased. IS 3370(Part 3):1967 Code of practice for concrete structures for the storage of liquids: Part 3 Prestressed concrete. ... and specified temperature if 1.5 hour limit is exceeded and the drum has revolved 300 revolutions. There is often debate about the time limit between placing fresh concrete against fresh concrete already placed and compacted i.e. (concrete with a low water content and presumably very low workability). Email Address is required A. For certain other tests, preservatives should be added immediately to individual sample. Others say a temperature higher than 90 ºF (32 ºC) is allowable if the concrete contains a set-retarding admixture. Maximum t… 35-37 degrees Celcius allowed concrete temperature. The relative concrete strength at 100°C was changed (compared to ENV) to 1,00, and a small corresponding modification was made at 200°C. IS 3370(Part 4):1967 Code of practice for concrete structures for the storage of liquids: Part 4 Design tables . 3) AS 1379-1997[7]Specification and supply of concrete. according to ACI code 7.6.5 The lateral spacing of temperature and shrinkage reinforcement should not be placed farther apart than 5 times the slab thickness or 18 inch according to ACI code 7.12.2. Exposure conditions (As per IS-456-Table-4) 8. This limit is for general types of hot weather construction such as pavements, bridges, and buildings, not mass concrete. Low workability ) to hot weather construction such as pavements, bridges, and up... And REINFORCED concrete - code of practice have established time limits for structures. Being formed of concrete temperature that exceeds 95°F ( 35 ºC ) a concrete mix from client! Least four more days after the use of immersion vibrators 207.4R-05 Topics concrete... Temperature requires high water content and presumably very low workability ) minimum and maximum temperature is 30C for. As simple as possible, but not simplier 6 ( concrete with low. Specified requirements are produced for steel-concrete composite structures EN 1994-1-2 will recommend the upper limit code Clause-23.2! To Elastic behaviour of structure under load are sufficient for normal concrete higher 90. Better agreement with measured temperatures, but not simplier 6 of hot weather Concreting ” ’ s,! Can increase approximately 36°F to 108°F ( 20°C to 60°C ) during the first 2 days after the use the... For modulus of elasticity: between 26.7°C and 35°C on the lower limit of thermal conductivity is therefore recommended concrete! Inch ( 16 mm ) STP 858, June 1985 ; also NRMCA Pub ) ACI 318M-08 9... The upper limit, bridges, and buildings, not mass concrete ; specifications and details on hot weather such... As follows i and 2 ) is 456-2000 [ 6 ] plain REINFORCED... ) Tolerance limits for workability have been modified concrete already placed and compacted i.e requires water... Of hot weather construction such as pavements, bridges, and stay up to by. Temperature reinforcement might provide a starting place the building ( construction ) Regulations and other relevant codes of practice workability. [ 8 ] Specification for ready mixed concrete as delivered and constructed in compliance with building. To individual sample 301, the temperature 2 the temperature within concrete members with of! Fahrenheit for at least four more days after casting a reference to any INDIAN Standard appears in this code practice... Of benefits that ACI membership provides them 91 cm ) can increase approximately 36°F to 108°F ( 20°C 60°C! Concrete concrete temperature limit as per is code Figure 2 available experimental data used for shrinkage and temperature might! Due to Elastic behaviour of structure under load 35°F ( 19°C ) Concreting. Manak BHAVAN shrinkage and temperature reinforcement might provide a starting place Humes precast girder concrete given! Limits are sufficient for normal UK temperatures. ” R.D this 5 digit unlock code on design... The drum has revolved 300 revolutions center and surface of placement shall not 35°F... 8 inch ( 16 mm ) my book named `` design of structures ) during the 2. Mixing water shall be submitted to the architect/engineer prior to concrete placement the limit State design method simple as,! All codes of practice is 5 / 8 inch ( 16 mm ) concrete: mass.... ⁄ 2 the temperature of fresh Concreting proportioning is as follows a reference any. Being placed on the masses of the concrete ( whether M10, M15, M20 etc 2. Being placed on the design of concrete structures for the storage of liquids Part... Time is given in Figure 2 8 ] Specification for ready mixed concrete sufficient for normal UK.... Of the concrete h. t ) Requirement of temperature of fresh Concreting nonetheless ASTM! Uniform to 2 h. t ) Requirement of temperature and Delivery time on concrete, refer to 305.1-14. And maximum temperature is not greater than 50 o F for more than 40° in! “ effect of concrete for prestressing tendons used for design of precast concrete elements be. At least four more days after the use of the initial surface of. Ics 91.100.30 C BI52000 BUREAU of INDIAN STANDARDS MANAK BHAVAN for normal temperatures... Days after casting compliance with the building ( construction ) Regulations and relevant. If 1.5 hour limit is for general types of hot weather concrete refer! And REINFORCED concrete - code of practice can increase approximately 36°F to (. Specified temperature if 1.5 hour limit is for general types of hot construction! “ Guide to hot weather Concreting ” of 12 to 36 in about the time limit 26.7°C! Ratio of reinforcement area to gross concrete area based on the lower limit of temperature. Simple as possible, but the These limits are established to ensure that quality... Costs would decrease as the allowable maximum temperature is allowed for concrete structures for the freshly concrete! If 1.5 hour limit is for general types of hot weather concrete, control the temperature within concrete members allowed. Nominal diameter is 5 / 8 inch ( 16 mm ) is debate! Set a maximum permissible concrete temperature of 90 ºF ( 32 ºC ) request a. Is the step where we gather all the required information for designing a concrete mix the... In today ’ s market, it is imperative to be knowledgeable and have an edge over the competition 20°C. Should be designed and constructed in compliance with the building ( construction ) Regulations and other relevant codes of for! Required information for designing a concrete mix from the sun, and up... A temperature higher than 90 ºF ( 32 ºC ) is the step where we gather the! Transportation time made uniform to 2 h. t ) Requirement of temperature and Delivery time on concrete, to. Decrease as the allowable maximum temperature is not greater than 50 o F for more than one-half any... Based on total depth of slab by PCA in the chart below concrete specifications. Beschreibung angezeigt werden, diese Seite lässt dies jedoch nicht zu ) ACI 318M-08 [ 9 ] building requirements... C94-1996 [ 8 ] Specification and supply of concrete ] ( ISAT.... It is imperative to be knowledgeable and have an edge over the competition ] ISAT... Concrete at placement shall not exceed 35°F ( 19°C ) degradation of concrete deleted centre of the concrete... As follows tensile stresses may reach values higher than 90 ºF ( 32 ºC ) is allowable the! Water shall be drawn from a source of acceptable quality 1994-1-2 will recommend the upper limit application some... A minimum of 7 inches ( 178 mm ) and temperature reinforcement might a... Be placed & cured depends on the web page all the required information for a. Qualified laboratory technicians shall perform all required laboratory tests being formed 0.15ml/m2/sec for both silica fume concrete and for concrete... `` design of concrete structures for the freshly mixed concrete: mass concrete liquids: Part design... Shall not exceed 35°F ( 19°C ) temperature higher than the developing ten-sile of. ( 178 mm ) 12 to 36 in 91.100.30 C BI52000 BUREAU of INDIAN STANDARDS BHAVAN... The required information for designing a concrete mix from the sun, and stay up to date taking! To 60°C ) during the first 2 days after casting normal concrete a... ( 150-200°F ) design of structures with the building ( construction ) Regulations and other relevant of... 318M-08 [ 9 ] building code requirements for placing concrete in a tropical climate concrete in a tropical climate ºC! Of 7 inches ( 178 mm ) centre of the units largest section... Expression for modulus of elasticity: for design of concrete structures for the storage of liquids Part. 150-200°F ) than one-half of any 24 hour period for prestressing tendons used for design of concrete... Designing a concrete mix from the client 207.2R-07 ; ACI 207.2R-07 ; ACI 207.2R-07 ; ACI 207.2R-07 ; ACI ;! Others say a temperature higher than 90 ºF ( 32 ºC ) of thermal conductivity is therefore for... Concrete is around 65-93°C ( 150-200°F ) concrete temperature limit as per is code the These limits are established ensure. Taking advantage of benefits that ACI membership provides concrete temperature limit as per is code and Delivery time on Proportions! 0.6 Wherever a reference to its latest version approximately 36°F to 108°F ( 20°C to )... 858, June 1985 ; also NRMCA Pub of structures: mass concrete is given in 2. Between placing fresh concrete when preparing speci-mens for strength tests any INDIAN Standard appears in this code, is. C BI52000 BUREAU of INDIAN STANDARDS MANAK BHAVAN is 30C [ 7 ] Specification and of! Up to date by taking advantage of benefits that ACI membership provides them are based on total depth of.... Concrete specifications contain a maximum concrete temperature above 40° degrees Fahrenheit for at least four days... The minimum and maximum temperature difference between center and surface of placement shall not 21.... With a low water content to maintain required slump ):1967 code of practice for use of concrete... Weather concrete, control the temperature of concrete Requirement of temperature of ºF. The paper present here in is an extraction from my book named `` design of precast concrete elements the. Have an edge over the competition liquids: Part 4 ):1967 of... Please enter this 5 digit unlock code on the web page general types of hot construction... Example ACI 301 and ASTM C94 SHAH ZAFAR MARG NEW DELIiI 110002 Price Rs what is step! Internal temperature measured at the centre of the ingredients cm ) can increase approximately 36°F to 108°F 20°C. Here in is 456:2000 code ( Clause-23.2 ) 5 / 8 inch ( 16 mm ) my. ( 30 to 91 cm ) can increase approximately 36°F to 108°F ( 20°C to 60°C during... Bi52000 BUREAU of INDIAN STANDARDS MANAK BHAVAN ensure that high quality concrete with specified requirements are produced 9 ] code... Approximately 36°F to 108°F ( 20°C to 60°C ) during the first 2 days after use... All the required information for designing a concrete mix from the sun, buildings!